Aluminum, magnesium and manganese plate installation method: aluminum, magnesium and manganese plate and titanium zinc plate is similar, generally belong to the way of vertical lock installation, outer wall plate rear still need to be set, keel layer, insulation layer, sound insulation layer, no daylighting function.
Aluminum, magnesium and manganese plate is a very cost-effective roofing, external wall materials. Aluminum alloy has been widely used in the construction industry and has played an important role in the development of modern architecture towards the direction of comfort, light weight, durability, economy and environmental protection.
Aluminum, magnesium and manganese roofing panel installation process
1. The actual length of the installed plate shall be measured. The length and width of the plate corresponding to the plate number shall be checked according to the measured length.
2. Place the lifting plate to the roof as the starting line, and align the width of the plate with the starting line.
3, the lower plate with tapping screw fixed on the purlin.
4. The support is installed on the z-type purlin.
5, after the installation of the support, the laying of non-woven cloth, insulation layer can be used * cut off to give the support.
6. The roofing plate with vertical sewing lock edge is pressed and formed by special pressing machine. After laying on the roof, the edge is bitten by special locking machine for 360°.
7. Install to the next signpost, review the plate installation deviation, and conduct a comprehensive inspection of the plate after meeting the design requirements.